Project Year: 2017

Topographical Survey Works for the Purpose of Upgrading Jalan 3210 from Pekan Batu 9, Cheras to Pekan Batu 14, Hulu Langat (Phase 1), Hulu Langat, Selangor Darul Ehsan.
Bathymetric Survey Works For The Purpose Of Iron Bridge Installation To Kg. Pasir Akar, Hulu Besut, Terengganu Darul Iman.
Diving Positioning Support For Discharge Culvert Inspection At 1 X 1000 Mw Coal-Fired Power Plants (T4), Tanjung Bin, Johor Darul Takzim.
Bathymetric Survey Works For Provision Of River Conservation And Flood Barrier Study At Estuary Of Sungai Kemasin, Kelantan Darul Naim.
Details & Leveling Survey for Project River of Life on Part of Sungai Kelang, Kuala Lumpur.
Bathymetric Survey For Purpose Of Seabed Study At Pekan, Pahang Darul Makmur.
Details Strip Survey For Proposed New Alignment Of Water Pipeline At Kg Baru Subang, Subang, Selangor Darul Ehsan.
Iron Ore Stockpile Survey for Stock Volume Quantity Calculation at Chaah, Segamat, Johor. (Nos 12 progress for January 2017).
Hydrographic Survey Works For Permission Planning Selangor Bio Bay Precint 1 & Precint 2 At Pulau Indah, Mukim Klang, Daerah Klang, Selangor Darul Ehsan.
Details Survey at Lot125849, Masjid Al-Ridhuan, Hulu Klang, Kuala Lumpur.
3 / 43