Project Year: 2021

River Cross Section Profile For Projek Pembinaan Jalan Baru Jalan Tanah Merah / Guar Kepayang Daerah Pendang, Kedah Darul Aman.
Kerja-kerja Ukur Topografi Bagi Pembinaan Kem Segamat Fasa 2, Segamat, Johor.
Kerja Ukur Dan Pencerapan Data Untuk Kajian Penambahbaikan Hub Perikanan Sungai Duyong, Daerah Melaka Tengah, Melaka.
Kerja Ukur Hidrografi Untuk Kerja Membina Dan Menaiktaraf Ban Serta Kawalan Hakisan Pantai Di 5 Lokasi Di Daerah Manjung, Perak.
Mining Topographic & Stockpile Survey On Lot3533 At Chaah, Batu Pahat, Johor Darul Takzim – July 2021.
Submarine Cable Route Pre-installation At Chao Phraya River, Bangkok, Thailand.
Submarine Cable Route Pre-installation Survey From Ban Thadan To Koh Panyi, Phang Nga, Thailand.
Proposed Echo Sounding Inspection From Pier 6 To Pier 14 Mssc Mainline Bridge Km – 1.78 Both Bound Section S6, Johor Darul Takzim.
Finalizing For Kerja-kerja Pengesahan Dan Pemetaan Utiliti Bawah Tanah (Underground Utilities Detection And Mapping Works) Untuk Projek-projek Di Bawah Pengurusan Aset Air Berhad Bagi Tahun 2020 – 2021 Udm 1: Utilities Detection And Mapping Works For Daerah Johor Bahru (Jb 1, Jb 2, Jb 3, jb 5 & Jb 6) -Batu Pahat-
Kerja-kerja Ukur Topografi Dan Butiran Bagi Potong Rumput Dan Mencuci Longkang Di Pangkalan pangkalan Tldm -Pangkalan Tldm Lumut, Perak.
2 / 42